Skip to the content
Pacific Constructionlogo darklogo light
  • Home
  • Projects
    • Project Map
    • Project Videos
  • News
  • Podcast
  • Contact
    • About Us
    • Careers
Pacific Construction
  • Home
  • Projects
    • Project Map
    • Project Videos
  • News
  • Podcast
  • Contact
    • About Us
    • Careers
HomeTenant ImprovementGolden Gate Fire Apparatus

Golden Gate Fire Apparatus

This 9,654 sqft tenant improvement was completed in two phases.

 

In the first phase, the 6,970 sqft first floor was remodeled to include a restroom, a warehouse office, and a parts counter. In addition, site improvements included seal coating the existing exterior
asphalt, striping, and the installation of a flagpole.

 

The second phase focused on the remodel of the 2,684 sqft second floor. Improvements included a conference room with new cabinetry, offices, a stone veneer accent wall, and signage.

Year:

2017

Location:

Sacramento, CA

Project Type:

Tenant Improvement

Size:

9,654 sqft
Prev Project Next Project

info@pac-construction

Design-Build General Contractor

4125 S. B Street
Stockton, CA 95206

(209) 477-2970


8950 E. Raintree Drive
Scottsdale, AZ 85260

(602) 351-5619

CA LIC # 959669
AZ LIC # ROC34330
NV LIC # 84866
WA LIC # PACIFC*840O7

Instagram
Facebook
LinkedIn
Vimeo

Join our newsletter

Keyword suggestion: Building, Residence