Thomas Allen Winery
A ground-up Pre-Engineered Metal Building was completed for Thomas Allen Winery. The facility was designed to support wine production, storage, and office operations. The project included full site preparation, foundation work, and complete PEMB installation. It is a quality build that supports the future of local winemaking.
Year:
2024Location:
Lodi, CAProject Type:
Ground-UpSize:
40,000 sqft